4 different jobs

  1. Reconfigure the HVAC for the IZ lab to allow for temperature regulation (required for compliance) in the lab.
  2. The downspouts in the front of the clinic should probably be replaced before the next big rainfall season.
  3. Generator installation – 21507 E Cliff Dr, Santa Cruz, CA 95062
  4. HR had requested to have the front reception desk area walled in for secure document storage, but I was not able to secure a bid to move the sprinkler head in this area to accommodate the new walls as requested.

if you can do any please let me know

Contact Details:
steven welch
Phone: (407) 493-8484
Email: use the contact form on this page

Send us a message

  • * denotes required field